|
Course Code:
|
|
AMEP
104
|
| |
|
Calendar Description:
|
|
This module covers the build up and repair of composite and tubular structure, and fabric covering.
|
| |
|
Date First Offered:
|
|
2005-09-01
|
| |
|
Hours:
|
| |
Total Hours:
|
67
|
| |
Shop Teaching Kitchen:
|
67.8
|
|
| |
|
Total Weeks:
|
|
15
|
| |
|
This course is offered online:
|
|
No
|
| |
|
Pre-Requisites:
|
|
Admission into the AME program.
|
| |
|
Non-Course Pre-Requisites:
|
|
None
|
| |
|
Co-Requisites:
|
|
None
|
| |
|
Rearticulation Submission:
|
|
No
|
| |
|
Course Content:
|
P4-1: Composite Project
- Draft a repair scheme for the damaged area
- Repair damage in honeycomb structure
P4-2: Fabric Project
- Complete fabric covering installation on structure
- Repair damaged covering
- Apply Identification marks
P4-4: Welding Project
- Introduction to skills necessary for repair of welded structure
|
| |
|
Learning Outcomes:
|
|
The student will complete a typical repair on a composite structure and practice skills necessary to repair tubular structure. The student will apply fabric to a structure and complete a typical repair to the covering. The student will assemble a wiring harness for a typical aircraft installation.
|
| |
|
Grading System:
|
|
Percentage
|
| |
|
Passing Grade:
|
|
70
|
| |
|
Grading Weight:
|
| |
Quizzes and Tests:
|
60 %
|
|
| |
Practicum:
|
40 %
|
|
|
| |
|
Percentage of Individual Work:
|
|
100
|
| |
|
Course Offered in Other Programs:
|
|
No
|
| |
|
Additional Comments:
|
P4-1=33%
P4-2=43%
P4-4=24%
|
| |
|
Text Books:
|
|
Required - Jeppson, A & P Tech. Airframe. Chapters Covered: All
|
|
Required - Jeppson, A & P Tech. General. Chapters Covered: All
|
|
Optional - Jeppson, Electricity and Electronics. Chapters Covered: All
|
| |